High Demand CNC Aluminum Machining Parts
- Grade:
-
heading machine,threading machine,CNC milling&turning machine,general milling&turning machine, grinding machine.
86-769-83315100
Click To Email Seller
Specification, Chemical & Mechanical Performance
Item name | High demand cnc aluminum machining parts |
Material | Stainless steel: SS200 series, SS300 series, SS400 series etc. Steel: #45, #20, Q235 etc. Aluminum: AL6061, AL6063,AL7075, AL5052 etc. Brass: C36000 (C26800), C37700 (HPb59), C38500 (HPb58), C27200(CuZn) etc. Titanium: TI-6AL-4V etc. Plastic: Teflon, Delrin, Acetal, Polyethylene, PVC etc. |
equipment | heading machine,threading machine,CNC milling&turning machine, general milling&turning machine, grinding machine. |
Tolerance | ± 0.001mm or as your request |
Finish | Surface treatment: Polishing; Anodize; Nickel, Zinc, Tin, chrome,Silver plating etc. Heat treatment: Point hardening, quenching hardening |
Specifications | Various shape size according to client’s requirement |
MOQ | Feel free to contact us for further inquiry. |
Delivery | within 7-10 working days upon receipt of 30% deposit. |
Packaging | Inner-Plastic Bag; Outer -Standard Carton Box. As your requirement |
Products Show
High Demand CNC Aluminum Machining Parts
Packing Infomation
FAQ
QC&QA
Our professional QC check the materials, productc strictly.
And our QA offer the full inspection of goods before shipping to assure everything is ok.
Payment
1. We can accept T/T,Western union,Paypal etc.
2. Full payment or 30% T/T in advance 70% balance before shipping.
3. The buyer is responsible for any tax or duty charged by their country.
Shipment
"1. We will check and choose the most suitable shipping way for customers after
see the order list. "
2. We will ship out within one to three working days for most orders.
3. Special order will ship out within five to ten working days.
Application
INSPECTION EQUIPMENT
"Our QC department will inspect the products in production and after production.
We promise you as below:
"
1. Check the raw material before the production.
2. Have random inspection during the production.
3. Make 100% inspection before the shipment.